TV Studio pop up for live broadcasts

Regal delivered a fast track design for supply and installation of air conditioning systems to a pop up TV studio for live broadcasts. Regal selected three Daikin twin split 20kW cooling only systems with a combined cooling capacity 140% of the room requirement to provide 90% cover in the unlikely event of a system failure. From…

Read more +